Why Gilroy Job Sites Choose Temporary Fencing Over Masonry
When that 2007 storm hit Downtown Gilroy, we saw masonry walls crumble while our chain link panels held strong. Here's why contractors from Miller Avenue to the Old Gilroy district keep calling us: Our galvanized steel frames handle 50+ mph winds (common during harvest season), and the interlocking hooks prevent the 'domino effect' we see with block walls. During last year's repaving near the Sunrise Park flood zone, we reconfigured a 300-foot barrier in one afternoon - try that with cement.
- Chain link installs in hours vs weeks for masonry
- No footing requirements like poured walls
- Relocatable panels adapt to site changes
- Meets all temporary OSHA perimeter standards
- Full disassembly for future reuse
